State of the Lake Report Finds Longer Summers in Tahoe
LAKE TAHOE
The 2014 State of the Lake Report was released in August by the UC Davis Tahoe Environmental Research Center. The report found that the lake level rose by only 6 inches during the spring snowmelt, one of the lowest increases recorded, and it seems likely that the lake level will fall below the natural rim later this year. Drought conditions also influenced a lower than usual inflow of nutrients, such as nitrogen and phosphorus, from streams for another year.
Lack of rain affected 2013 clarity levels, reducing fine sediment flow into the lake. Clarity in 2013 maintained the recent trend of slowing down the former rate of degradation, with a value of 75.3 feet.
By combining a half-century of data collection at Lake Tahoe with climate-change forecasts, scientists found that summer-like conditions have been extended at Lake Tahoe. By the end of this century, summer may be two months longer than it was in the 1960s, and maximum temperatures may rise by 8 degrees F.
Winter temperatures were significantly colder than normal in 2013. But as a result of warmer summers, the peak in the timing of snowmelt was again earlier than historical conditions. The July surface water temperature was the warmest in five years.
One likely effect of longer summers is a reduction in dissolved oxygen at the bottom of the lake. Data shows that this could take between five to 10 years if deep lake mixing was totally absent. It would affect fish life and the chemical balance within the lake. Read the full report at terc.ucdavis.edu/stateofthelake.
Tesla to Build Factory in Northern Nevada
RENO
On Sept. 4, Tesla announced the opening of a multi-billion dollar battery gigafactory in Northern Nevada, pending legislative approval. The gigafactory is expected to bring thousands of jobs to the area and give a boost to the regional economy.
“The Washoe County Commission and staff are excited about the great news that Tesla has chosen Northern Nevada. We have been promoting the numerous benefits this region offers to industries and Tesla coming our way shows we do indeed have plenty of economic opportunities for those looking to relocate,” said Washoe County Commission Chairman David Humke.
Candidate Forums Feature Interactive Opportunities
TRUCKEE
The Truckee Donner Chamber of Commerce, Contractors Association of Truckee Tahoe Political Action Committee, and the Tahoe Sierra Board of Realtors have teamed up with Truckee Tahoe Community Television Channel 18, the Sierra Sun, and Moonshine Ink to provide two candidate forums aimed at enhancing voter education and participation in the upcoming election. The forums will be broadcast live from the Truckee Town Hall Council Chambers. Additionally, TTCTV-Channel 18 will stream the video on its home page at ttctv.org and air a series of reruns of the forums.
The first forum will feature the Tahoe Forest Hospital District Board of Directors candidates and the Truckee Fire Protection District Board of Directors candidates. This forum is set for Oct. 1, from 6 to 8 p.m. The second forum will focus on the Truckee Town Council and the Tahoe Truckee Unified School District Measure U Bond. This forum is set for Oct. 2, 6 to 8 p.m. Residents can email questions to the TDCC in advance of the forums to carlaembertson@yahoo.com. Please put “Candidate Forum Question” in the subject line. Info: Carla Embertson, (530) 587-2757
Placer Supervisors Approve Martis Valley Trail Funding
MARTIS VALLEY
Work on a much-anticipated bike path got a boost in August from the Placer County Board of Supervisors when they authorized funding for a 1.76 mile section of the Martis Valley Trail. The plan is for a 10.4 mile trail to eventually connect Truckee to North Lake Tahoe. The trail will run from the edge of Truckee, through Martis Valley and the Northstar Village, to the Fiberboard Freeway near Brockway Summit above Kings Beach.
Trout Creek Trail Awarded $1.52 Million Grant
TRUCKEE
Phase 2 of the Trout Creek Trail has been selected to receive $1.52 million in Federal Active Transportation Program funds. The Trout Creek Trail is a Class 1 paved pedestrian and bicycle trail that will connect Northwoods Boulevard to Bridge Street in downtown. Phase 1 is currently under construction and will connect Bridge Street to the existing dirt Euer Valley Road.
On Aug. 20, the California Transportation Commission adopted 148 biking and walking projects out of 770 applications. The Trout Creek Trail Phase 2 project was one of 22 projects selected in the small urban/rural areas. The town will provide 20 percent matching funds towards construction for a total estimated construction cost of $1.9 million.
Tahoe Prosperity Center Launches Broadband Assessment Effort
LAKE TAHOE BASIN
The Tahoe Prosperity Center, in an effort to facilitate the expansion of high-speed Internet service to the Lake Tahoe Basin, Alpine Meadows, and Squaw Valley, in August launched an Internet speed test and survey at tahoeprosperity.org/speed.
Anyone living, working, or visiting these areas is encouraged to participate in the speed test and short survey on their current Internet service. This data will help the center assess the current gaps in high-speed Internet service, determine priority areas for broadband upgrades or expansion, and provide a much-needed objective picture of the state of Internet service within the Basin. Participants will be entered into a drawing for an iPad mini. The speed test will be available until Oct. 31.
New Gateway Signs Mark Nevada Entrances to Lake Tahoe Watershed
LAKE TAHOE BASIN
Installed near Daggett Summit on Nevada State Route 207, Spooner Summit on U.S. Highway 50, and on Highway 431 on Mount Rose, the decorative gateway signs read: “Entering the Lake Tahoe Watershed — Help Protect It!”
The signs were installed in July in a collaborative project led by the Tahoe Regional Planning Agency, U.S. Environmental Protection Agency, Nevada Division of Environmental Protection, and Nevada Division of State Lands. The signs are meant to help remind the millions of people who visit Lake Tahoe each year that they are entering a special place and have a duty to help protect its famously clear waters and environment.
Lake Forest Boat Ramp Closed Early For Rehabilitation Project
TAHOE CITY
The Tahoe City Public Utility District closed the Lake Forest Boat Ramp on Sept. 7 for the season in order to perform extensive rehabilitation. The district is taking advantage of the drought conditions and will replace the existing concrete ramp, as well as performing maintenance dredging to enable boating operations at lower lake levels. Construction will extend through December.
Free Bike Trail Map Now Available
TAHOE BASIN
The Lake Tahoe Bicycle Coalition has produced an update to the Lake Tahoe Bikeways Map that is now available throughout the Tahoe region at no charge. Fifty thousand maps have been printed and are available at leading bike shops, visitor centers, lodging properties, and resorts through the region. An online map version is also available for download and printing by visiting tahoebike.org.
Locals Receive Grant to Clean Up Beach
EAST SHORE
A couple of locals who are behind the community effort to remove graffiti from Bonsai Beach on the East Shore recently received funding from Powdr Corp.’s Protect Your Playground grant to provide graffiti removal supplies. Sam Rossi and Dylan Eichenberg received the grant, which is administered through Boreal Mountain Resort and is established to provide individuals with funds needed to start projects that solve environmental issues in their communities. Another Bonsai Beach Cleanup Day is scheduled for Oct. 12.
NTPUD Breaks Ground on New Administrative Building
TAHOE VISTA
The North Tahoe Public Utility District Board of Directors held a groundbreaking ceremony in August for the new administrative offices on National Avenue in Tahoe Vista. The project includes the replacement of the three outdated buildings to comply with current ADA standards, building codes, and seismic codes, and will also include a large multi-purpose meeting room, conversion of existing overhead utility distribution system facilities to underground, reconnection of utility distribution lines; and site BMPs. The total budget for the project is $4 million. The first phase of the project began the week of Aug. 25 with the demolition of the National Avenue Community Center Building.




