One of the first-ever emails I exchanged with Moonshine Ink’s publisher, Mayumi Peacock, mentioned the well-known three-way stop intersection at Donner Pass Road and Bridge Street in Truckee. We were scheduling a time for me to come in for an official interview for the news reporter position (happy ending there, thankfully), and she urged caution for my route to the office on Riverside Drive.
I don’t have the email anymore, but she wrote something to the effect of “there’s this odd-duck intersection you’ll pass through; know that it’s a three-way stop, not a four-way.”
Now that I’m somewhat of a veteran of driving through the spot, I’m well familiar with the sight of drivers hesitating as they inch north on Bridge Street and approach Donner Pass, where three different lines of cars are staring them down. The natural inclination to stop is understandable, as we are more so a nation of four-way stops than three-way ones.
That said, these stop signs’ days are limited.
If this spot has been a point of frustration for you, know that there is change on the horizon for this odd-duck intersection (as well as the Bridge and West River intersection on the other side of the railroad tracks — don’t get me started on having to turn left onto Bridge Street from West River, oh my god).
I reached out to the Town of Truckee and Truckee Police to ask about the past, present, and future of where Bridge Street and DPR come to meet.
~ AH
Is there a back story to the design of the three-way intersection at Donner Pass Road and Bridge Street?
Becky Bucar, Town of Truckee public works director/town engineer: This intersection configuration has been in place since before the town incorporated in 1993, including when portions of Bridge Street and Donner Pass Road were part of state Route 267, which was operated and maintained by Caltrans. The unconventional configuration is in place so that northbound traffic does not queue and back up over the railroad tracks to the south.
What is the latest status of installing a traffic signal at this intersection (paired with the one to be installed at West River and Bridge Street), and when can residents and visitors expect to see on-the-ground action?
BB: The town has developed a design for new traffic signals at these two intersections, as well as new sidewalks, crosswalks, and railroad gates. The goal is to start construction in 2027, but this could be delayed. The project approval process is complicated because the signals need to be coordinated with the railroad operations and associated gates, and many agencies are involved, including the Union Pacific Railroad, California Public Utilities Commission, and the Federal Railroad Administration. Construction cannot start until necessary approvals have been received.

How many safety incidents, if any, have occurred there over the past five years? Any anecdotes of note?
Captain Kyle Vickers, Truckee Police Department: In the last five years, we’ve seen five collisions occur within this intersection at a rate of about one a year. All were relatively minor and did not involve any significant injuries. Most of these incidents resulted from the party at fault not realizing northbound traffic doesn’t stop when passing over the tracks and entering the intersection. None of these were particularly noteworthy.





